Formwork
Jump to navigation
Jump to search
7-6-095
Alternantive term: Shuttering
Temporary boarding or sheeting used to contain concrete during pouring and setting, shaped internally to the same profile as required for the external face of the structure.
Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)