Earthworks

From International Dictionary of Marine Aids to Navigation
Revision as of 00:35, 25 February 2009 by Oferiks (talk | contribs) (1 revision)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

7-6-255

Artificial modification of the ground.


Note: The material excavated is called spoil, the material used to build up is called fill.




Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)