WG1 | 2.2.4 Revise Guideline on Effective Intensity |
Brief final review before submitting for approval.
Inputs ENG12-3.1.3.1/2 refers.
|
Dr Alwyn Williams
Alwyn.Williams@gla-rad.org
| 2nd Oct |
WG1 | 2.2.7 Develop Guidance on Colour Fading of AtoN (plastic and painted) – methods to measure and assess |
Continuation of updating Guideline G1134.
Inputs ENG12-3.1.1.1/2 and ENG12-3.1.2 refers.
|
Mr Jorgen Royal Petersen
JRP@dma.dk
| 2nd Oct |
WG1 | 2.2.2 Develop new recommendation on marine light Terms of Measurement | Continuation of creating a new recommendation. Input ENG8-9.2 refers. |
Dr Alwyn Williams
Alwyn.Williams@gla-rad.org
| 2nd Oct |
WG1 | 2.2.3 Develop E200-5 on Optical Performance into a Guideline | New work based on existing Recommendation text. |
Mr Malcolm Nicholson
m.nicholson@sealite.com
| 2nd Oct |
WG2 | 1.1.1 Revised guidance on Simulation Technology to revise G1097 (ENG10-14.2.7) in cooperation with ARM (task 1.2.4) |
Monitor ARM outcome
Work overtaken by ARM, see ARM11-10.11 WP Draft Guideline 1097 Ed.1.1 Technical Features and Technology Relevant for Simulation of AtoN
ENG10-3.1.25 Liaison note
| ARM, ENG Rapporteur Simulation Mr Yeo Jimin | 2nd Oct |
WG2 | 1.2.1 Develop Guidance on checking that 3rd party AtoN providers are providing what they are obliged to provide– 3rd party AtoN provider quality control. (Joint ARM cooperation) |
Further development
ENG10-14.2.12 last version ENG10-3.1.7 Liaison Note from ARM: ENG leading
|
David Jeffkins david.jeffkins@amsa.gov.au
Greg Hansen greg.hansen@amsa.gov.au
| 2nd Oct |
WG2 | 2.3.1 Develop guidance to identify appropriate standards for AtoN equipment with extreme environmental conditions. Humidity, temperature, enclosure ratings, UV etc) Also including peak intensity specification for LED AtoN, batteries, optic service factor, thermal cap, etc. | Continue work on input paper |
Mr Mariano Luis Marpegan
mlmarpegan@gba-hidrovia.com.ar
| 2nd Oct |
WG2 | 2.3.3
Develop Guideline on Tidal flow data capture and display
|
ARM11-8.1.1 WP Annex 1 – Draft Guideline on Tidal Current Signal System (ARM10-13.2.7.1)
ENG10-9.3 WP Draft GL
ENG10-14.2.5 Liaison Note to all Committees: Support request
| To be announced | 2nd Oct |
WG2 | 2.3.5 Joint workshop with all 4 technical committees on Cyber Security in AtoN operations | CCG pursuing approval to hold in Canada in October 2020 | To be announced | 2nd Oct |
WG2 | 2.4.1
Develop Guidance on what constitutes a good marine AtoN solar panel
| Continue work on input paper |
Mr Peter Dobson
Peter.Dobson@trinityhouse.co.uk
| 2nd Oct |
WG2 | 2.5.1
Develop guidance quantifying characteristics to meet nautical and operational requirements and ways to verify them
| Postponed to ENG13 |
TBC
Mr Peter Schneider
Peter.Schneider@wsv.bund.de
| 2nd Oct |
WG2 | 2.5.2
Develop new guideline on radar reflector (reflection) properties
| Continue work on input paper |
Mr Peter Schneider
Peter.Schneider@wsv.bund.de
| 2nd Oct |
WG2 | 2.5.3
Creating an overview guidance on floating AtoN
| Postponed to ENG13 |
TBC
Mr Peter Schneider
Peter.Schneider@wsv.bund.de
| 2nd Oct |
WG2 | 5.1.1
Review telemetry Guideline 1008
| Continue work on Guideline |
Mr Peter Dobson
Peter.Dobson@trinityhouse.co.uk
Mr Peter Schneider
Peter.Schneider@wsv.bund.de
| 2nd Oct |
WG3 | 3.1.1 Resilient PNT
Guideline on resilient PNT
| During the ENG11 period a structure of a new Guideline was proposed which included updating and incorporating the contents of R-129, G. will be developed further. |
Dr Alan Grant
Alan.Grant@gla-rad.org
| 2nd Oct |
WG3 | 3.2.2 / 3.2.3 / 3.2.5 Terrestrial positioning and timing: R-Mode (all related items) |
Understanding the latest developments on R-Mode requirements, activities and roadmap updates
The draft Guideline was developed further during ENG11 and work on this will continue during the ENG12 period
|
Mr Michael Hoppe
michael.hoppe@wsv.bund.de
| 2nd Oct |
WG3 | 3.2.6 Terrestrial positioning and timing: S-200 product specifications |
Updated version of S-240 review along with any updates to S-245, S-246 and S 247.
Guidance note being developed, in collaboration with the Secretariat, on the role of these performance standards and the overall approval process.
|
Mr Younghoon Han
yhhan@kriso.re.kr
| 2nd Oct |
WG3 | 3.3 Racon and radar positioning | Guideline on an Enhanced Radar Positioning System could be developed further |
Mr Paul Mueller
paulfmueller@sbcglobal.net
| 2nd Oct |
WG3 | 3.4.2 / 3.4.4 Augmentation Services: DGNSS Guidance | A draft Guideline that supports administrations seeking to maintain their services and those seeking to retire their DGPS was developed at the future of DGNSS workshop, the same will be reviewed and updated. The WG should consider whether items 3.4.2 and 3.4.4. can be merged into one task fulfilled by the draft Guideline. |
Mr Jesper Backstedt
jesper.backstedt@sjofartsverket.se
| 2nd Oct |
WG3 | 3.4.3 Augmentation Services: New Recommendation on Augmentation for maritime use | Final draft Rec. has been provided to ENG12 seeking comments from the wider Committee. |
Mr Etienne Leroy
etienne.leroy@cerema.fr
| 2nd Oct |
WG3 | 3.4.5 Augmentation Services: High accuracy systems | The WG should consider the on-going need for this task and update the task register accordingly. | | 2nd Oct |
WG3 | Additional items of review and update | WG3 has been asked to review the Navguide as a separate task during this period |
Dr Alan Grant
Alan.Grant@gla-rad.org
| 2nd Oct |
WG4 | 2.6.3 / 2.6.4 / 2.6.5 / 2.6.6 Environment, Sustainability & Legacy: Heritage IALA website |
Review progress of Heritage IALA website
Acquire consent from nominees for the publication of nomination forms and photos of nominations onto the IALA website.
Assess progress of Award artwork and presentation in respect to IALA Heritage Lighthouse of the year 2020 to Barra Lighthouse, Salvador, Brazil ensuring a plan is in place
Write article for publication in IALA Bulletin on IALA Heritage Lighthouse 2020 (Barra Lighthouse, Salvador, Brazil) and invite nominations for the 2021 accolade (deadline February 2021.
Progressing the Heritage module within the IALA Level 1.1 course.
Discussion and development of proposals to form future work programme.
Development of a new IALA Guidance Document: ‘Modernising Heritage Marine Aids to Navigation’
|
Mr Peter Hill
Peter.Hill@trinityhouse.co.uk
| 2nd Oct |