Difference between revisions of "Initial Operational Capability (IOC)"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed. | Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed. | ||
Source: Nick Ward, IALA e-Nav committee vicechair, March 2009 | |||
{{languages|Initial Operational Capability (IOC)}} | {{languages|Initial Operational Capability (IOC)}} |
Revision as of 12:00, 2 January 2009
Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed.
Source: Nick Ward, IALA e-Nav committee vicechair, March 2009