Difference between revisions of "Initial Operational Capability (IOC)"
Jump to navigation
Jump to search
(5 intermediate revisions by one other user not shown) | |||
Line 2: | Line 2: | ||
Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed. | Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed. | ||
Source: Nick Ward, Vicechair, IALA e-Nav Committee, March 2009 | |||
{{languages|Initial Operational Capability (IOC)}} | {{languages|Initial Operational Capability (IOC)}} | ||
Line 7: | Line 9: | ||
[[Category:Alphabetical Index]] | [[Category:Alphabetical Index]] | ||
[[Category:IALA Dictionary 2009 Edition]] | [[Category:IALA Dictionary 2009 Edition]] | ||
[[Category:IALA Dictionary 2023 Revision]] |
Latest revision as of 03:26, 3 February 2024
Operational status of a GNSS or other radio-navigation system declared by the providing authority, when the system is considered usable, but before validation has been fully completed.
Source: Nick Ward, Vicechair, IALA e-Nav Committee, March 2009