Difference between revisions of "Formwork"
Jump to navigation
Jump to search
m (1 revision) |
|
(No difference)
|
Latest revision as of 00:35, 25 February 2009
7-6-095
Alternantive term: Shuttering
Temporary boarding or sheeting used to contain concrete during pouring and setting, shaped internally to the same profile as required for the external face of the structure.
Please note that this is the term as it stands in the original IALA Dictionary edition (1970-1989)