Difference between revisions of "Full Operational Capability (FOC)"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
Operational status of a GNSS or other radio-navigation system declared by the providing authority when commissioning and validation are considered to have been completed satisfactorily. | Operational status of a GNSS or other radio-navigation system declared by the providing authority when commissioning and validation are considered to have been completed satisfactorily. | ||
Source: Nick Ward, IALA e-Nav committee vicechair, March 2009 | |||
{{languages|Full Operational Capability (FOC)}} | {{languages|Full Operational Capability (FOC)}} |
Revision as of 12:00, 2 January 2009
Operational status of a GNSS or other radio-navigation system declared by the providing authority when commissioning and validation are considered to have been completed satisfactorily.
Source: Nick Ward, IALA e-Nav committee vicechair, March 2009